Projects · Australia wide
Projects we help with
From a backyard pool to a subdivision. Different size, same risks: lost money, lost time and bad work.
02.1
Past projects
Project 01 · Central Coast, NSWCentral Coast renovationA tired 1980s brick home, brought back to life inside and out.RenovationOn timeOn budgetSee the project →
Project 02 · NSWBackyard granny flatA self-contained granny flat for an investor: from working out what the site allowed, to choosing the builder and supervising it to handover.Granny flatOn timeOn budgetSee the project →
Project 03 · Rural NSWRetaining wall & landscapeA failing brick retaining wall replaced with a new concrete block wall we designed and delivered, with upgraded drainage, steps and a fully planted embankment.Design & deliveryWall, drainage, landscapeSee the project →
Project 04 · Liverpool, NSWInvestment property refreshA tired rental turned around quickly and on a tight budget, to suit the owner and lift the rental return.Interior renovationQuick, low-cost worksHigher rental yieldSee the project →
02.2
What we work on
- 01
Pools
Rock, access and drainage surprises, sorted before you dig.
What usually goes wrongTalk to us about this- Rock under the lawn, priced as a small allowance
- Crane or machine access you didn't budget for
- Pool fencing and drainage that fail inspection
- 02
Renovations & extensions
Old houses hide things. We stop the extras getting out of hand.
What usually goes wrongTalk to us about this- Hidden problems once walls and floors come up
- Variations that add up week by week
- Structural changes priced without an engineer
- 03
Granny flats
A "fixed price" that usually isn't. We check what's left out.
What usually goes wrongTalk to us about this- Sewer and stormwater connections excluded
- Site costs and access left as extras
- Approval path chosen without checking the block
- 04
New homes & knockdown rebuilds
The biggest cheque you'll write. We check every quote, claim and stage.
What usually goes wrongTalk to us about this- Stormwater and OSD left out of the price
- Provisional sums that are far too low
- Progress claims paid before the work is done
- 05
Duplexes, townhouses & subdivisions
More approvals, more trades, more risk. We keep it on track.
What usually goes wrongTalk to us about this- Council conditions and contributions that blow the budget
- Water, sewer and road works priced late
- Delays that eat into your finance and your margin
- 06
Civil & commercial
Tender, contract and delivery, run for the owner.
What usually goes wrongTalk to us about this- Contractors' variations and claims going unchecked
- Programme slipping without anyone pushing back
- Engineering conditions missed until the end
02.3
Don't see your project?
If it involves a builder, a council or a contract, we can probably help. Tell us what you're planning.
Tell us about your project →